Reliability and uptime
Quality rate calculator
Quality is the share of units produced that met specification first time. Rework counts against it. A unit that needed a second pass consumed capacity twice, even though it eventually shipped.
Quality = Good units ÷ Total units produced × 100
Units that met specification without rework
Show the assumptions
- Formula
- Quality = Good units ÷ Total units produced × 100
Count reworked units as defects here. Counting them as good is the usual reason a plant reports 99% quality while the scrap account says otherwise.
Quality rate
—
Prefilled with an example. Change any number and the result updates.
How to calculate Quality rate
Quality = Good units ÷ Total units produced × 100
Worked example
- Good units 14,925 units
- Total units produced 15,000 units
Quality rate = 99.50%
Reading the result
Count reworked units as defects here. Counting them as good is the usual reason a plant reports 99% quality while the scrap account says otherwise.
Benchmarks
99.9% is the quality figure commonly cited as world class within the OEE framework.
Quality rate questions
Does rework count as a defect?
Yes, in the OEE definition. The unit failed on the first pass and consumed capacity twice, so counting it as good hides a real loss. Track rework and scrap separately if you need to tell the two apart.
Is quality rate the same as first pass yield?
For a single operation, effectively yes. They diverge across a multi-step process, where first pass yield is usually rolled up by multiplying the yield of every step. That produces a much lower and more honest number than measuring the final step alone.