Reliability and uptime

Quality rate calculator

Quality is the share of units produced that met specification first time. Rework counts against it. A unit that needed a second pass consumed capacity twice, even though it eventually shipped.

Quality = Good units ÷ Total units produced × 100

Units that met specification without rework

Show the assumptions
Formula
Quality = Good units ÷ Total units produced × 100

Count reworked units as defects here. Counting them as good is the usual reason a plant reports 99% quality while the scrap account says otherwise.

Quality rate

Prefilled with an example. Change any number and the result updates.

How to calculate Quality rate

Quality = Good units ÷ Total units produced × 100

Worked example

  • Good units 14,925 units
  • Total units produced 15,000 units

Quality rate = 99.50%

Reading the result

Count reworked units as defects here. Counting them as good is the usual reason a plant reports 99% quality while the scrap account says otherwise.

Benchmarks

99.9% is the quality figure commonly cited as world class within the OEE framework.

Quality rate questions

Does rework count as a defect?

Yes, in the OEE definition. The unit failed on the first pass and consumed capacity twice, so counting it as good hides a real loss. Track rework and scrap separately if you need to tell the two apart.

Is quality rate the same as first pass yield?

For a single operation, effectively yes. They diverge across a multi-step process, where first pass yield is usually rolled up by multiplying the yield of every step. That produces a much lower and more honest number than measuring the final step alone.

Log defects against the asset

UpKeep records the work, the hours and the failures this metric depends on, so Quality rate is a report rather than a spreadsheet exercise.