LOTO Tag Printer
In UpKeep, this app lives under Nova > Custom Apps. Opening it from here takes you to UpKeep, so you will need an account to install it.
LOTO Tag Printer in 30 seconds
Part of the Nova Apps playlist.
What it does
It turns a work order into a set of lockout/tagout tags. Pick a work order, and isolation points stored on the asset (fields named Isolation Point 1, Isolation Point 2 and so on) load automatically; add or adjust points as needed, add the technicians working under the lockout, and preview each 3 x 5.5 inch tag with the work order, asset, tag number and warning text before downloading a print-ready PDF.
NOVA APPS
Build what the catalog does not have
Describe the app you need in plain language and Nova builds it on your own data, on web and mobile.