PRODUCT RELEASES
Welcome to our Product Releases page, your hub for the latest on UpKeep's enhancements. Review our release notes, posted every Tuesday and Thursday, or dive into our UpKeep Release Friday demo videos for a deeper look into the latest updates and features.

Filtra tus resultados
Demostración 21 de 145
PRODUCT RELEASE • 11.6.2026
Share Inspections as PDFs, Run Them from Mobile, and More
Export Fleet and Checklist inspections as PDFs, run inspections from mobile, attach work order photos on iOS and Android, and plan CAPA verification in Safety.
Ver lanzamiento
PRODUCT RELEASE • 10.30.2026
Manage PMs in One Place, Name Root Causes Your Way, and More
Manage every PM from one page, name CAPA root causes your way, and get AI drafts that read the originating event. Plus fixes across CMMS and Safety.
Ver lanzamiento
PRODUCT RELEASE • 10.23.2026
(duplicate)
Convert assets to vehicles without losing history, plus additional improvements and fixes.
Ver lanzamiento
PRODUCT RELEASE • 10.16.2026
Full Inspection Records, Smarter Courses, and More Control Over Your Data
Full inspection records, technical courses, scoped API tokens, required fields, location QR scanning, and iPhone Duo support are live in UpKeep.
Ver lanzamiento
PRODUCT RELEASE • 10.9.2026
Smoother Navigation, Smarter Exports, And a Platform That Responds the Way It Should (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate)
UpKeep’s October 9 release loads asset details instantly on iOS and Android, makes faster work order exports available to every customer, and fixes issues across work orders, requests, PMs, mobile...
Ver lanzamiento
PRODUCT RELEASE • 10.2.2026
Smoother Navigation, Smarter Exports, And a Platform That Responds the Way It Should (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate)
UpKeep's October 2 release gives Nova its own email address and access to your custom data apps, adds admin shortcuts and bulk actions to People and Teams, surfaces nested locations...
Ver lanzamiento
PRODUCT RELEASE • 9.25.2026
Smoother Navigation, Smarter Exports, And a Platform That Responds the Way It Should (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate)
UpKeep's September 25 release adds Nova Workflows for automated request routing, one-click Work Order PDF exports, Provider Document Vault and Team Member Compliance, UpKeep Learn Audit Snapshots, and a new...
Ver lanzamiento
PRODUCT RELEASE • 9.18.2026
Smoother Navigation, Smarter Exports, And a Platform That Responds the Way It Should (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate)
UpKeep's September 18 release brings the Action Inbox, a refreshed sidebar, and criticality-based OSHA log types to UpKeep Safety v0.484.0, and makes the Create Request screen open instantly on the...
Ver lanzamiento
PRODUCT RELEASE • 9.11.2026
Smoother Navigation, Smarter Exports, And a Platform That Responds the Way It Should (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate)
UpKeep's September 11 release brings Mobile Purchase Orders to iOS and Android, a Compliance Dashboard and multi-language courses to UpKeep Learn, Learn data in Nova and Custom Apps, and automatic...
Ver lanzamiento
PRODUCT RELEASE • 9.1.2026
Smoother Navigation, Smarter Exports, And a Platform That Responds the Way It Should (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate)
UpKeep's Nova Marketplace lets you install curated, ready-made apps in one click. Plus: a new Provider Dashboard with compliance filters, centralized provider chat, customizable Request Portal forms, and a redesigned...
Ver lanzamiento
PRODUCT RELEASE • 8.28.2026
Smoother Navigation, Smarter Exports, And a Platform That Responds the Way It Should (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate)
Track the real cost of safety incidents, onboard new hires with structured learning paths, and brand your training portal — plus multi-permit support, OSHA 300 enhancements, smarter Nova interactions, and...
Ver lanzamiento
PRODUCT RELEASE • 8.21.2026
Smoother Navigation, Smarter Exports, And a Platform That Responds the Way It Should (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate)
Nova apps are now available on mobile. Every custom app your team has built in UpKeep is ready on your phone, from asset dashboards to camera-powered work order tools. Tap...
Ver lanzamiento
PRODUCT RELEASE • 8.7.2026
Smoother Navigation, Smarter Exports, And a Platform That Responds the Way It Should (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate)
UpKeep's August 2026 mobile release brings full offline checklist support to iOS and Android — complete work order checklists with no connection and sync every edit automatically when back online.
Ver lanzamiento
PRODUCT RELEASE • 7.31.2026
Smoother Navigation, Smarter Exports, And a Platform That Responds the Way It Should (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate)
UpKeep's July 31 release brings Nova Apps cross-product data access for EHS and Edge, Safety document approval workflows, multi-location user assignment, a new Setup Center, CAPA custom fields, Provider Portal...
Ver lanzamiento
PRODUCT RELEASE • 7.24.2026
Smoother Navigation, Smarter Exports, And a Platform That Responds the Way It Should (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate)
UpKeep's July 24 release brings Edge alert schedules that eliminate false sensor alarms outside operating hours, plus Nova Apps third-party integrations for connecting external tools and data, and app Favorites...
Ver lanzamiento
PRODUCT RELEASE • 7.17.2026
Smoother Navigation, Smarter Exports, And a Platform That Responds the Way It Should (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate)
UpKeep's July 17 release brings shareable training certificates, video seek-ahead controls, a full reminders module, and manual course building to UpKeep Learn — plus file uploads, in-app AI, and deeper...
Ver lanzamiento
PRODUCT RELEASE • 7.10.2026
Smoother Navigation, Smarter Exports, And a Platform That Responds the Way It Should (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate)
UpKeep's July 10 release brings Nova Custom Apps with sharing and standalone links, Scheduler auto-save and UI simplification, a redesigned Safety Data Sheet experience, Learn timing enforcement, and major Providers...
Ver lanzamiento
PRODUCT RELEASE • 6.19.2026
Smoother Navigation, Smarter Exports, And a Platform That Responds the Way It Should (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate)
UpKeep's June 19 release adds Nova Scheduled Tasks for automated prompts, 2x credit efficiency, SDS approval workflows in Safety, CMMS status sync, two new Studio apps for work order accountability...
Ver lanzamiento
PRODUCT RELEASE • 6.26.2026
Smoother Navigation, Smarter Exports, And a Platform That Responds the Way It Should (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate)
UpKeep's June 26 release brings AI-powered course creation in UpKeep Learn, anonymous safety reporting, multi-asset linking, simplified role management, a redesigned JHA experience, and a new Studio app for PM...
Ver lanzamiento
PRODUCT RELEASE • 6.12.2026
Smoother Navigation, Smarter Exports, And a Platform That Responds the Way It Should (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate)
Three new Studio apps for PM planning, condition-based maintenance, and location data management. Custom Safety Event types. A more than 3x improvement in Nova credit efficiency. Android work order load...
Ver lanzamiento
PRODUCT RELEASE • 6.5.2026
Smoother Navigation, Smarter Exports, And a Platform That Responds the Way It Should (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate) (duplicate)
Three new Studio apps for PM planning, condition-based maintenance, and location data management. Custom Safety Event types. A more than 3x improvement in Nova credit efficiency. Android work order load...
Ver lanzamiento
Page 1 of 7
Filtrar
MÁS DE 4000 EMPRESAS CONFÍAN EN LA GESTIÓN DE OPERACIONES DE ACTIVOS
Los datos de sus activos y equipos no pertenecen a un silo. UpKeep simplifica ver dónde se encuentra todo, todo en un solo lugar. Eso significa menos conjeturas y más tiempo para concentrarse en lo que importa.





















![[Review Badge] Gartner Peer Insights (Dark)](https://www.datocms-assets.com/38028/1673900494-gartner-logo-dark.png?auto=compress&fm=webp&w=336)
